Mon to Fri – 9am to 5pm EST 888-965-5693 [email protected]

Rental+Logo1-01
fer-mob3
SKU: ICP 10-HALF NG 208/240V 1 PH (LM100DG)
Rational 10 Rack Gas Combination Oven iCombi Pro 10-half size

The Rational 10 Rack Gas Combination Oven iCombi Pro 10-half size is designed with the busy catering, restaurant and hotel sectors in mind. It offers intelligent climate management that measures, adjusts and controls the humidity down to the exact percentage. The actual measured humidity in the cooking cabinet can be adjusted and viewed.

It features intelligent control of cooking paths with automatic adjustment of the cooking steps to the defined desired result, e.g. browning and degree of cooking, safely and efficiently. It offers precise monitoring and calculation of browning based on the Maillard reaction, in order to reproduce optimal cooking results. One can interrupt intelligent cooking paths or switch from the iCookingSuite to the iProductionManager for maximum flexibility.

Specifications

Dimensions (W x D x H)

Cooking system (body) 850 x 1014 x 775 mm
Cooking system (complete) 850 x 1064 x 842 mm
Cooking system with packaging 935 x 1250 x 955 mm

Weight

Maximum loading quantities/rack 4.5 kg
Maximum total loading quantities 45 kg
Weight electric unit without packaging 127 kg
Weight electric unit with packaging 147 kg
Weight gas unit without packaging 155 kg
Weight gas unit with packaging 175 kg

Connection requirements electric

Voltage 3 NAC 400 V
Electrical connected loads 18.9 kW
Steam mode output 18 kW
Convection mode output 18 kW
Fuse 32 A
RCD model F
Voltage 3 AC 220 V
Electrical connected loads 17.3 kW
Steam mode output 16.47 kW
Convection mode output 16.47 kW
Fuse 50 A
RCD model B

Connection requirements gas

Liquid gas G31
Total nominal thermal load 22 kW
Nominal thermal load steam mode 20 kW
Nominal thermal load convection mode 22 kW
Required connection flow pressure 25 – 57.5 mbar

LPG G30

Total nominal thermal load 23 kW

Nominal thermal load steam mode 21 kW
Nominal thermal load convection mode 23 kW
Required connection flow pressure 25 – 57.5 mbar

Natural gas H G20

Total nominal thermal load 22 kW
Nominal thermal load steam mode 20 kW
Nominal thermal load convection mode 22 kW
Required connection flow pressure 18 – 25 mbar

Features

 

Intelligent, connectable cooking system with the operating modes poultry, meat, fish, egg dishes/desserts, side dishes/vegetables, baked goods and finishing as well as the cooking methods roasting, cooking, baking and grilling

Combi-steamer in accordance with DIN 18866 (in manual mode)

For most cooking processes used in commercial kitchens

For the use of steam and convection, individually, successively or together

Capacity

10 lengthwise insertion for 1/1 GN-Accessories

Removable standard racks with 68 mm insertion distance

Wide range of accessories for various cooking processes such as grilling, braising or baking

For use with 1/1, 1/2, 2/3, 1/3 GN-Accessories

Manual

Download Specification Sheet

What is the difference between lease and rental?
Under a rental agreement, you do not own the equipment nor are you making payment instalments against a final purchase fee. Our rental agreements however provide the flexibility for you to hand back the equipment for no penalty fee at the end of the contract period while service and maintenance is inclusive in your rental payment.

How much do I pay?
We charge monthly rental payments for the equipment to make it easy to budget. After you secure the items with the equivalent of a single weekly payment through the website we will ask for an 12-week deposit upfront, but this will be returned to you when you complete your contract as long as the equipment is in good order.

What credit checks will you do?
We ask all our rental customers to fill in a credit check form before we agree to send out equipment. It’s conducted through our partners at Experian, one of the world’s leading experts in credit. The form takes five minutes and is easy to understand, we can do this by sending you a link or over the phone. This allows us to understand the right level of credit to extend, which protects you from undue financial burden.

Will your credit check affect my credit score?
We undertake a soft credit check to assess your eligibility for our rental products.

When do I get my equipment?
7-10 days if ex stock, our advisors will let you know when you are finalising your order.

Do I need to pay for installation?
This depends on the equipment, but in most cases you will have to pay towards installation.

Curbside deliveries
All deliveries, unless otherwise stated, are curbside deliveries. This means we deliver to the curb at your property, and you are responsible for moving them into position and installation.

Can I rent more if I already have one contract with you?
If your business is growing or you suffer an expected breakdown you can rent more! Each time you do we keep this simple and easy so you have clear view of your payment dates and amounts for each new addition!

What happens if the equipment breaks down?
Under rental contracts we will arrange for your equipment to be fixed if there is a problem with it.

Important equipment information
There may be a variety of power connections available with this product, or it may require additional connection equipment. Please also ensure that you have the correct power source in place to run the equipment. Please check with your sales representative if you’re unsure.

Title

Speak to our equipment experts now!

Monday – Fri 9am – 5pm EST

888-965-5693